We are able to execute pile load test as per prepared drawing layouts and make a platform by secondary girders with main girder and placing the jacks on prepared pile head of required capacity , after that placed the kentledge loading by concrete blocks with the crane and hydras.
ANY TYPE OF SHORING WORKS WITH CONTIGIOUS ,SOLDIER
Any type of shoring works with contigious ,soldier and sheet piling with anchoring and shotcrete
A small river named Duden flows by their place and supplies it with the necessary regelialia. It is a paradisematic .
S. No. | Name of Work | State | Name of Employer | Value of contract |
---|---|---|---|---|
1 | Construction of Dimapur Bypass (Assam Portion) of 4/6 lane
pavement on EPC basis from existing Km 159.400 of NH-36 to
existing Km 102.500 of NH-39 and up to end point of Assam portion
[Design Km 118.050 to design Km 132.375] (length 14.325 Km) in
the State of Assam under Phase-A of SARDP-NE” | Assam | Spargo Infra | Rs. 1.49 Crores |
2 | “Construction of Balance work of Widening, Strengthening and
reconstruction of Hazaribagh – Barkagaon – Tandwa – Khelari –
Bijupara (SH-7) Road ( including bridges & bypass) in the State of
Jharkhand on EPC basis” | Jharkhand | SHAJ | Rs. 0.27 Crores |
3 | Upgradation of NH-81 with a minimum of 2-Lane with paved
shoulder configuration starting from km 19.205 to km 46.550 in the
District of Malda, on EPC mode in the State of West Bengal under
Annual Plan 2017-2018 | West Bengal | Kartikey Infra, West Bengal | Rs. 0.78 Crores |
4 | “Improvement of NH 60 from Km 3300 to km 3550 & from Km 3600
to Km 3740 except the stretch from Km 337.703 to Km 339.046 (for
Suri ROB) by way of strengthening of existing carriageway and
laying of wearing course from Km 3550 to Km 3600 in the district of
Birbhum, West Bengal under EPC mode (Job No. 060-WB-2018-
19/433)” | West Bengal | Kartikey Infra, West Bengal | Rs. 0.35 Crores |
5 | Strengthening of road from km 73 to 119.175 of NH-100 Under
NH(O) on EPC mode in the state of Jharkhand | Jharkhand | Trisha Construction,
Road Construction
Department, Jharkhand | Rs. 0.15 Crores |
6 | Design Report for widening and strengthening of Road work and
Reconstruction of culverts in Km. 31 to Km 61 (chainage Km.30 to
Km. 60.500) oh NH-99 under NH Division Hazaribagh | Jharkhand | Trisha Construction, NH
Division, Hazaribagh
(Under MGCPL) | Rs.1.44 Crores |